Fact file: SANDF projects: past, present & future

Known South African National Defence force (SANDF) projects, past, present and future, presented alphabetically per Service/Division. The information below was compiled from Department of Defence Annual Reports and from written answers to questions asked in Parliament.

This may correspond in some respects to Strategic Capital Acquisition Master Plan (SCAMP), the 30-year rolling SANDF acquisition programme schedule. “SCAMP is a strategic management tool which the DoD employs to assess and organise its capital acquisition requirements… SCAMP assists in prioritising … needs.”



Pic: A Project Ukhozi (eagle) Gripen flying over the Union Building in Pretoria.









Colour code:

Blue: Completed/terminated projects

Black: Current/ongoing projects

 

 

 

SA Army

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Abund

Optimisation of personal equipment of SA soldier

Camouflage Uniform

Project completed.

 

 

2

Acrobat

Infantry indirect firing system

60mm Mortar

In production. PAP1 April 27, 2006. OT&E Sep 2007. Partial acquisition. Commissioning set for 2009.

 

Denel

3

Adrift

Upgrade of ZT2 anti-armour missile to ZT3 Ingwe baseline standard for SA armoured Corps

ZT3A2 (Ingwe baseline)

PAP March 2005.

Partial acquisition only. Production phase.

Foreseen commissioning 2008.

 

Denel

4

Albany

Upgrade of the 4-axle semi-trailers to a 5-axle semi-trailer configuration

Trailers

Production. Commissioned from March 2006

Partial acquisition only.

.

 

5

Ambition 1A

Acquisition of rapid deployment reconnaissance vehicles for the special forces

Hornet

Commissioned

 

BAE Land Systems OMC

6

Ambition 1B

Acquisition of rapid deployment logistical vehicles for parachute and special forces

Gecko

Commissioned from June 2006

Partial acquisition only.

 

LMT

7

Aorta

MBT acquisition

KMW Leopard 2?

 

 

Identified need. No funding.

8

Arum lily

Armoured car upgrade/

turret upgrade

Rooikat

PAP August 2004, Delivery November 2007.

Partial acquisition.

Production phase.

Foreseen commissioning 2008.

 

BAE Land Systems OMC

9

Ascetic

Tactical electronic warfare system

EW

 

Three systems contemplated.

 

10

Atolasa

Upgrade of the Olifant MK 1B main battle tank to MKII status

Olifant

PAP January 26, 2006.

Partial acquisition.

Production phase.

Commissioned from late 2007.

 

BAE Land Systems OMC

11

Bioskoop

Development of local warning radar systems for air defence

Kameelperd

Project completed.

 

 

 

12

Blesbok

Partial acquisition of new-generation water purification and provisioning system

Water purification system

SR2 defined January 12,2006

Project study phase. Foreseen date for production: 2008.

 

7B” shortened acquisition process

13

Canton

New generation multiple launch rocket system

Bateleur

Completed. 1980s

48 acquired

 

14

Carnatic

Scatter mines

Landmines

-

Eight heliborne systems, eight vehicle systems with 31 275 anti-personnel and 19 500 antitank mines.

 

15

Catchy

Similar to Dart (below), but using Israeli technology3.

Air Defence Artillery Command-and-control

Completed, 1990s.

 

 

16

Chiro

Small minefield breaching system (manpack)

Mini-Plofadder

Completed, 1990s.

18+75 systems

 

17

Citizen

Partial acquisition of a new-generation maintenance, repair and recovery system

Technical Services systems

Project study, SR to AACB, August 10, 2006.

Foreseen commissioning 2013.

 

Technical Services Corps

18

Cytoon

Development and partial acquisition of a battlefield surveillance and mobile intelligence processing system

Battlefield surveillance radar, thermal imagers, UAV.

PAP April 21, 2004. Partial acquisition.

Production phase.

Forseen commissioning: 2009.

 

Not fully funded

19

Dart

Integration of a system consisting of an EDR220 designation radar from RRS with Control and Display (CDS) from C²I² Systems, prototype X-band tracking radar from RRS and CSIR, prototype fire control system from Synertech (a division of ADS), 35 mm Mk5 AAA cannon from 10 ADA

Regiment.4

Air Defence Artillery Command-and-control

Completed, mid 1990s.

 

 

20

Gijima

APC upgrade

Casspir

PAP approved April 21, 2004. Was to be completed by March 2007.

 

 

21

Guardian

(GBADS I5)

Local warning segment GBADS.

Thales radar, Starstreak VSORADS.

12 Light Multiple Launchers (LML), 120 missiles.

To be complete by December 2009.

R300m/R322m (FY2000).

 

Denel is prime contractor. High profile contract.

22

Hoefyster

Badger” ICV to replace Ratel.

Patria AMV

Badger”

Extended project study. PSR6 (2) October 2005, PSR (3) August 2006. Contract awarded May 2007.

R8.4bn for 264 vehicles. Five variants.
30/40 to be built by Patria.
About R31.8 million each.

Contractors: EADS, Patria, Fulcrum, Denel, LMT, more.

23

Isibali

SAEC New generation (insensitive) explosives

Explosives

Entered concept phase, September 2005.

 

 

24

Jury

APC upgrade

Mamba

Commissioning

 

 

25

Khanyisa

Infantry anti-tank gun upgrade

M40A1 106mm RCL

 

 

Currently without ammunition.

26

Kingfisher

Infantry anti-tank guided missile

Milan ADT

Contract awarded to MBDA/Fulcrum December 2006.

First units delivered early 2008.

R296.7m for 43 launcher upgrades and missiles.

MBDA

Fulcrum

27

Kittyhawk

Technical services equipment.

Recovery and repair vehicles.

1990s.

210 recovery vehicles, 95 repair vehicles.

 

28

Klooster

Artillery target engagement system (ATES)

AS2000

PAP October 21, 2004. Delivery EFT September 2007, 2nd Regt April 2008

 

ADS, ATE (Vulture)

29

Loggim

New generation indigenous MBT

Reumech Tank Technology Demonstrator (TTD)

Cancelled 1990s.

Requirement for 282 MBT. 1 TTD built.

 

30

Musuku

Development and partial acquisition of Advanced Multi-Role Light Artillery Gun Capability (AMLAGC).

LEO 105mm

SR, September 28, 2005. PSR and spec was due by February 28, 2007. Foreseen commissioning: 2012.

Budget: R134m.

 

Denel

31

Muhali

Artillery ammunition and charge system upgrade, G6

G6

SR, April 19, 2006, AACB. PSR (1) September 2006, PSR (2) April 2007. Foreseen commissioning: 2008

 

Denel

32

Outcome

(GBADS III)

Medium range air defence.

Umkhonto AWSAM?

 

 

Denel Dynamics

33

Pantile

Engineer earthmoving/construction equipment

SAEC.

Earthmoving equipment.

SR approved, February 13, 2006. PSR (1) February 2007.

Foreseen commissioning: 2009

 

 

34

Pigeon

Infantry GPMG upgrade

SS77

PAP November 10, 2004. Commissioning.

 

Denel.

35

Pirate

Partial acquisition of a new generation hand-held mine detector

Mine detector

SR, February 13, 2006. PSR, January 2007.

Foreseen commissioning: 2008.

 

 

36

Prickley (sic) pear

Data base geographical information system for SANDF

Geo data

Concept phase. SR & functional study.

 

R200K required from SCAMP. Presented to AASB, July 20, 2006.

37

Prima

Mechanised air defence artillery

Mechanised 35mm SPAAG (SP anti-aircraft gun)

Cancelled

One prototype built, apparently without authorisation.

 

38

Protector

(GBADS II)

Development and partial acquisition of a mobile air defence system (GBADS)

Mobile ADA

SHORAD

Umkhonto

PAP, March 2008. Acquisition study in progress.

Foreseen commissioning: 2010.

R3bn7

Denel Dynamics.

39

Raadsaal

Acquisition of a heavy/extra heavy recovery vehicle

Recovery vehicle.

Kynos Aljaba?

Commissioning. Completion scheduled for March 2008.

 

Kynos

40

Raleigh

Long-range indigenous antitank guided missile

ZT3

Completed.

169 systems planned for.

TOW Mapats clone with Israeli input.

41

Skovvot

ADA upgrade

Upgrade of Oerlikon 35mm towed air defence guns.

Completed

64+64

 

42

Stikstof

GBADS

Surface-to-air missile

Cancelled

221 systems contemplated

 

43

Swatch

Development and partial acquisition of mobile camping system

Weatherhaven tents

Project study underway, SR, August 10, 2005. PSR March 2007.

 

No funds available at May 2007.

RCS

44

Teamster

Development and partial acquisition of mass field feeding system (Field kitchen)

Field kitchen

Acquisition study. SR, October 18, 2005. PSR approved September 5, 2005. AP March 2007. Foreseen commissioning: 2008.

 

 

45

Tladi

Zone 1 anti-tank. New generation portable infantry A/T rocket launcher

RPG7/FT5 replacement.

Staff target in process of approval.

 

 

46

Topstar

Partial acquisition of new-generation gyroscopic systems for the artillery

Gyroscope

Project study. SR, April 21, 2006. PSR, February 2007.

Foreseen commencement of commissioning 2008.

 

Not SCAMP funded.

47

Utolo

Minefield breaching system

Replacement for Plofadder.

Functional study, ST, February 5, 2005. Functional study and SR, February 2007.

Partial acquisition only.8

 

 

48

Velskoen

New generation mine-protected vehicle.

TFM Mamba

Completed

1964 contemplated.

TFM

49

Vislyn

Minefield breaching system

Plofadder

Completed

244 anti-personnel mine systems, 182 anti vehicle-mine systems

Casspir carried.

50

Vistula9

Operational supply support system (Cargo and fuel handling).

6x6 & 8x8 trucks

Approved PSR December 8, 2005. Awaiting final decision to commence contracting.

1200 trucks for R3.2 bn10

Requirement for 3000?

BEE partner sought. Daimler v MAN v Iveco

51

Vlooimark

Infantry automatic grenade launcher

40mm Y3 AGL

Commissioning. Preliminary completion March 2007.

Partial acquisition only.

Denel

 

52

Vundulula

Field fire fighting system

Firefighting.

Project study phase.

Project not funded for future phases.

Partial acquisition only.

 

53

Warrior

Dismounted soldier system

Smart load-bearing equipment and uniform.

Acquisition study, PSR February 9, 2006

Project study submitted.

Acquisition study for low risk items.

Development plan for complex sub-systems.11

 

Similar o the US Army’s Land Warrior, etc.

54

Wyandotte

Deeper level logistics

Transport by truck, train and ship.

PSR, May 2007.

Project study phase.

Project not funded for further

phases.12

 

 

55

Zenula

New generation self propelled artillery

G6 Rhinoceros

Completed.

144 systems contemplated.

 

56

?

Instrumented CTC

 

 

 

Identified need. No registered project.

Table 20A.1: SA Army projects

 

SA Air Force

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Accord

Upgrade of the C47 aircraft fleet to C47-TP standard.

C47TP

All aircraft have been upgraded and the project was completed in FY 2006/07.

 

 

2

Adobe

Self-protection system for the Oryx.

Oryx

Project complete, June 2007.

 

 

3

Assegaai

Development of a short-range air-to-air missile.

(A-Darter)

Development phase has been contracted as a joint venture with Brazil.

 

 

4

Bandsman

Upgrade and replacement of airport fire tenders

Fire tenders

Phase 1 to upgrade existing fire tenders was completed in 2006. Phase 2 for the acquisition of fire tenders is in its project study phase with completion date of 2010.

 

 

5

Bark13

 

Development of a reconnaissance Cheetah based on the Mirage IIIR2Z. Not adopted. Aircraft used to test “advanced combat wing” developed under Project Carver.

Cheetah

Completed.

 

 

6

Brahman14

 

Upgrade of 11 Mirage IIID2Z, 3 DZ and 16 EZ to Cheetah D2, D and E.

Cheetah

1990s.

Completed.

Aircraft phased out 2008.

 

 

7

Carver15

 

Advanced new technology fighter project.

New generation fighter

1990s.

Cancelled.

 

 

8

Continent

Future medium transport.

Airbus A400M

Delivery due late 2010.

8-14

Also EW and refuelling platform, possible AEW.

9

Cushion16

 

Acquisition of five Cheetah Bs from Israel (Nesher T).

Cheetah

1980s.

Completed.

 

 

10

Deer

Oryx Stand-off Radar Jammers.

Oryx EW

Project completed, June 2007.

 

 

11

Design

V4 medium range missiles (BVRAAM)

V4 BVRAAM

Programme completed 2004, weapon deployed on Cheetah. Phased out 2008.

 

Israeli technology.

12

Design

Aircrew training simulator.

Aircrew training simulator

Final acceptance of the system at 80 Air Navigation School.

Operational Test and Evaluation scheduled to end late August 2008.

 

 

13

Drummer

Oryx midlife upgrade.

Denel Oryx

 

40

First two phases in progress.

14

Ebb

C130 midlife upgrade.

LM C130B; BZ

Scheduled completed March 2008.

9

 

15

Filter

New generation bomb fuze.

Bomb fuze

Programme completed.

 

 

16

Flange

Light utility helicopters.

Agusta A109

 

30

 

ADS simulator: R72m.

 

 

Ice cream

Harvard cockpit upgrade17

 

 

 

 

17

Impose

Combat support helicopter.

Denel CSH2A Rooivalk AND Mokopa ATGM

Rooivalk: Deployment baseline by May 2008, Dev. to be completed by 2009.

 

Mokopa: missiles to be acquired. No timeline18

R8.1bn to date.

 

Mokopa: R70m set aside to acquire missiles. R120m spent on development to FY2007, R4.6m to be spent in FY2007/8 and Denel to spend a furtherR98.25.19

 

ADS desktop trainer: R30m.

 

 

18

Itambo

Future MALE UAV.

 

Still under consideration by SAAF not yet registered as a Required Operational Capability (ROC).

 

 

19

Jarmen 1

Intercontinental VIP aircraft.

 

Acquisition of the B737 is completed and the aircraft is in operation at 21 Squadron.

 

 

20

Jarmen 2

Upgrade of two Falcon 50's

 

Upgrade of the two aircraft is competed and the aircraft is in operation at 21 Squadron.

 

 

21

Hooker

C47TP EW trainer

C47TP

 

1

 

22

Kambro

Future Medium Fighter.

-

-

-

Superseded by Gripen ALFA acquisition.

23

Kiemvry20

 

Cheetah fitted with a strengthened undercarriage and clear vision windscreens.

Cheetah

Completed

 

 

24

Koiler

Day/night reconnaissance system for the C208.

 

Tactical Intelligence System, datalink.

Acquisition of three sets of mission equipment and the modification of 11 aircraft have been contracted. Operational test and evaluation scheduled 2008. Release to service planned for late 2008.

4? systems21

Aerosud, Denel

25

Macaw

ATC radar upgrade.

 

Registered August 1996.

Completed 2007.22

Six new radar sets, one mobile set upgraded. R34.924 million.

 

26

Maulstic

(Sitron)

Acquisition of four maritime helicopters.

Agusta-Westland 300 SuperLynx

Delivered, 2007.

4

 

27

Muggie

Replacement of the radio-switching network.

 

Project in study phase, 2006.

 

 

28

Neckwar23

Glass cockpit demonstrator using a Mirage F1.

Mirage F1

Completed 1990s.

 

ATE and others. Precursor to indigenous Hawk navigation and weapons system (Project Ukhozi).

29

Rossma

Upgrading of six AR3D radars.

 

Completed.

Tellumat

 

30

Recipient24

 

Rebuild of a crashed Cheetah D2 with an Atar 09K-50 engine.

Cheetah

Completed.

 

 

31

Tunny25

 

Cheetah C acquisition.

Cheetah

Ex Israeli Kfir airframes incorporating advanced avionics and EW. Completed.

 

 

32

Ukhozi

Advanced Lightweight Fighter Aircraft.

Saab JAS39 Gripen C/D.

 

29

 

33

Winchester

Lead-in Fighter Trainer.

BAE Systems Mk120 Hawk.

 

24

 

ADS cockpit procedure trainer: R8m

 

34

Not registered as a project in 200726

Future MALE UAV.

 

Still under consideration by SAAF not yet registered as a Required Operational Capability (ROC).

 

 

35

Not registered as a project in 200727

Future maritime patrol aircraft

 

Still under consideration by SAAF not yet registered as a Required Operational Capability (ROC).

 

CASA C295 or LM C27J

36

(Unknown)

Astra avionics upgrade

 

Tenders closed March, 2007.

35 aircraft to be upgraded, R400 million28 budgeted.

Pilatus

37

(Unknown)

Low-cost, side-by-side, basic trainer

A Pakistani option?

 

12 aircraft @R2-3m each, R24-36m for the fleet29.

 

38

(Unknown)

 

Pavement Management

System, (6

Projects)

 

 

 

 

 

(Unknown)

AWACS”

Erieye

 

 

 

Table 20A.2: SA Air Force projects

 

 

SA Navy

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Ackers

Acquisition of Type 351 Minesweepers.

 

Completed.

 

Ships retired 2008.

2

Biro

OPV

 

 

 

 

3

Brutes

Half life upgrade.

SAS Drakensberg

Project in definition phase in 2006.

 

 

4

Caliban

Life extension.

Warrior Class

Completed.

 

 

5

Coupe

FAC(M) acquisition

Warrior class

Completed

2

-

6

Diodon30

Technology research, local future Naval Combat System Architecture and related computer network.

 

Completed, 1980s/90s.

 

 

7

Falcon

Frigate acquisition

Domestic design, 1990; Spanish design 1995.

Aborted 1995.

-

Sitron precursor.

8

Japonica

FAC(M) acquisition.

Warrior class.

Completed.

6

-

9

Kantor

New tug

Tug

 

 

 

10

Mapantsula

Acquisition of Mine Counter-measure equipment.

 

Project in definition phase. Scheduled for completion by 2010.

 

 

11

Metamorphosis

Integrated ship support concept and agency.

 

 

 

Internal budget31

 

12

Millennium

LPD/LPH.

 

Project in definition phase.

None allocated as yet.

 

13

Patris

Acquisition of mine countermeasure processing suites.

 

Cancelled due to a change in SAN mine warfare policy.

 

 

14

Sitron

Frigate acquisition.

Meko A200SAN.

All four delivered, fifth order possible.

4

Valour-class

15

Stanchion

Acquisition of an underwater signature measurement system.

 

Project in acquisition phase. Phase 1 (the signal measurement system) is scheduled for delivery December 2007. Phase 2 (magnetic treatment centre) is scheduled for completion December 2009.

 

 

16

Suvecs

Indigenous frigate combat suite.

ADS/CCII/

etc

 

 

Cancelled in favour of Thales TAVITAC.

17

Taurus

Corvette acquisition.

A69

Aborted

 

Thwarted by arms embargo, mid 1970s.

18

Traipse

Acquisition of two multi-purpose harbour tenders.

 

Delivered, in service.

2, Damen.

 

19

Twibill

Acquisition of six general workboats.

 

Delivered, in service.

6

 

20

Wills

New generation submarine

Type 209 1400

Delivered, in service.

3

 

21

Xena

C3I for OBS

 

Tender issued Sept 2007

 

 

22

-

Anti-multipath enhancement for the Valour-class frigates’ Optronic Radar Tracker (ORT).

ORT

Pre-production testing will commence in 2009, leading to a roll-out on all ORTs in 2010.

 

CSIR

23

-

Close-In Surveillance System (CISS) to defend against asymmetric threats to ships.

Close-In Surveillance System (CISS)

 

 

Protoclea

24

-

Offboard decoy system against anti-ship missiles

 

ECM trials commenced in 2005 and an Advanced Concept Technology Demonstrator should be ready in 2010.  

 

 

SAAB Avitronics, IMT & Univ of Stellenbosch

25

-

Unmanned Aerial Vehicle

Autonomous maritime surveillance helicopter

 

 

Univ of Stellenbosch

26

-

Solid-state Frequency Modulated Continuous Wave (FMCW) stealth radar

StealthRad

 

 

Reutech

27

-

Human Language Technology,

Electronic language translator

 

 

University of Stellenbosch

28

-

Active protection technology

Active protection technology littoral and inland water environment

 

 

SAAB Avitronics

29

-

Sonar development for underwater security. 

Sonar

 

 

CSIR

 

Table 20A.3: SA Navy projects

 

 

SA Military Health Service

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Beginning32

Defence aeromedical and specialist training facility.

 

Pre-concept phase.

R400 million, not budgeted for.

 

2

Mutchkin (sic)

 

 

Development and partial acquisition of a basic chemical and biological self-protection capability consisting of CB detection, protection and equipment de-contamination.

 

Project currently in design phase, which is planned to be complete by June 2008. Partial acquisition is planned to commence by December 2008 and first deliveries by September 2009

6 urban defence systems, 3 conventional, R422 million reqd, R198m on budget for next 13 years.

 

Table 20A.4: SAMHS projects

 

 

 

 

Strategic

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Burglar

ICBM

RSA-series ICBM

 

Four completed

Cancelled

2

Kerktoring

Atomic bomb

Fission weapons

 

6 completed, one partial,

Cancelled 1991

 

 

CMIS

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Billet

SANDF semi-static infrastructure.

 

Staff Requirement due April 2007.

 

 

2

Chamber

Tactical EW capability for the SANDF.33

 

Staff target approved Nov 2006. Functional study due mid-2007.

R110 million

 

3

Domino

CMIS structure.

 

The first stage is the design for completion

April 1, 2007 of the second stage; implementation must be completed

April 1, 2008.

 

 

4

Enlace

SAAF new generation VHF/UHF radio.

ACR500 (fitted to Rooivalk, Hawk, Gripen, A109, SuperLynx.

Complete

 

 

5

Filosoof

EW.

Landward EW system for 2 Signal Regt.

Completed 2001.

 

 

6

Janitor/

Bedmaker

SAAF integrated airspace control system, 1983-1995.

C2, radar, remotely-operated HF, VHF, UHF radio for low-level in-flight C2.

 

 

SA SCADS (SA Surveillance

Control & Air Defence System).

7

Legend

SA Army command-and-control.

C2 system

Functional study complete. Acquisition Plan due July 2007.

 

 

8

Radiate

SANDF tactical communications.

 

Project Study Report due July 2007.

 

 

Table 20A.5: CMIS Division projects

 

 

Policy & Planning

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Balanced Score Card

Strategic management system to underpin performance management.

IT

First order business solution set for implementation, FY2007/8, fully fledged system to be implemented Jan 2009.

 

 

2

DIMS

 

 

 

 

 

4

Departmental Organisational Structuring System (DOSS)

Regulate organisational structure process within DOD.

IT

 

 

 

5

Gejima

Strategic planning tool and information system.

 

 

 

 

6

Loquacious

DoD Business Process Management.

IT

Pilot project has been run

(Launched Feb 2005).

 

 

7

Ntuthwane

Professional strategic planning capability for the DoD.

IT

On hold in March 2007

 

 

Table 20A.6: P&P Division projects

 

 

Joint Operations

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Battlespace34

A high-level overview of the characteristics of the current and possible

future African operational environment and of some of the military

implications thereof”.

 

 

 

 

2

Office

FARDC cooperation in the DRC.

 

 

 

 

3

-

Nabob fence

 

 

 

 

4

Simunye35

Project Simunye is a technology project for defining, testing and

evaluating Joint Air Defence (JAD) Command and Control (C2) systems

concepts and related systems architectures”.

 

 

 

 

5

Sundowner

Long-range high-speed boats for the Special Forces.

 

Delivered.

 

 

 

 

CDCC

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Nation

GCIS “tracker research for the DOD

 

 

 

 

 

 

 

Chief Human Resources

Number

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

1

Restore

Creation of Peace Mission Training Centre at the SANWC.

 

Complete

R30 million,

US, UK, Canadian donor money, SANDF contributed R3 million.

 

 

 

Ad hoc

Organ

Project Name

Description

Equipment

Project Phase

Numbers & Value

Remarks

SA Army

Mounting36

Closure of Commando units and Group HQs

 

 

 

 

IG

Tsakani

Pre-audit of territorial reserve units and HQs closed i.t.o. Project Mounting.

 

 

 

 

 

 

 

1 Production Acquisition Plan

2 Staff Requirement

3 Richard Young, by email, October 15, 2007.

 

4 Richard Young, by email, October 15, 2007.

5 Three phases proposed, total budget estimated R3.5bn in 2000.

GBADS 1 (Guardian): MANPADS VSORAD (man-portable air defence system, very short range air defence system)

GBADS 2 (Protector): Mobile SHORAD

GBADS 3 (Outcome): MRAD (medium range air defence)

6 Project Study Report

7 Helmoed-Römer Heitman quoted in The Star, October 13, 2007. Graeme Hosken, Michael Schmidt and Johan du Plessis, 9 killed in army horror. “The SANDF is in the middle of a R3-billion programme to upgrade its ADA, adding gunner-toted short-range missile systems, longer-range vehicle-mounted systems and a new fire-control system”

8 DoD written reply to a Parliamentary question, May 11, 2007.

9Five projects to renew Logistic main equipment are in various stages of execution, namely from project study phase to the acquisition phase. The projects include equipment such as the replacement of the SAMIL 100 and 50 range of transport vehicles and the introduction of a mobile camping system.”

10 Beeld, November 2008.

11 DoD written reply to a Parliamentary question, May 11, 2007.

12 DoD written reply to a Parliamentary question, May 11, 2007.

 

13 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

14 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

15 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

16 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

17Dean Wingrin, email, October9, 2009.

18 Written reply to question 1046 in the National Assembly, June 26, 2007.

19 Written reply to question 1046 in the National Assembly, June 26, 2007.

 

20 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

21 From the DoD Annual Report, 2005/6. The figure conflicts with that given in a written answer to a question in Parliament, reproduced in the previous column. (Internal question paper 13-2007, Question 624, May 11, 007.

22 Written reply to question 1046 in the National Assembly, June 26, 2007.

23 ATE briefing, February 2008.

24 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

25 Dave Becker, Cheetah Farewell, SA Flyer, May 2008, p40.

26 DoD written reply to a Parliamentary question, May 11, 2007.

27 DoD written reply to a Parliamentary question, May 11, 2007.

28 Written reply to question 1046 in the National Assembly, June 26, 2007.

29 Written reply to question 1046 in the National Assembly, June 26, 2007.

30 Richard Young, per email, November 13, 2007.

31 Written reply to question 1046 in the National Assembly, June 26, 2007.

32 Written reply to question 1046 in the National Assembly, June 26, 2007.

33 Written reply to question 1046 in the National Assembly, June 26, 2007.

34 Armscor Annual Report 2007

35 Armscor Annual Report 2007

 

36The SA Army Infantry Formation, which controls the Army Territorial Reserve, commences preparations to close down those units. (Project MOUNTING) Stage 2: Once the preparation has been completed, these units are handed over to Project TSAKANI where a pre-audit is done. The unit is then handed over to the Inspector General at DOD level, where a request to DIMS to de-activate the Unit-code is made. A unit is then considered closed. This whole process can take in excess of a year.”

 


....